- Industrial manufacturing
- Challenge
- A global packaging manufacturer with production and warehouse sites across dozens of countries was moving to SD-WAN — which needs two diverse internet paths per site. Wired-only second lines were costly, slow to provision and often shared the same vulnerable last mile.
- Orbius solution
- Orbius added managed LEO satellite as a fully diverse second path at each site — supplied, configured and monitored as a single service, folded into the existing SD-WAN with centralised billing and one support contact.
- Result
- Higher site uptime within budget, fewer engineer call-outs and vendor hand-offs, and one managed connectivity layer across a multi-country estate.
- Passenger transport
- Challenge
- An intercity coach operator wanted reliable on-board Wi-Fi for passengers across long rural routes — where cellular averaged only a few Mbps and dropped out between masts, well short of a usable experience.
- Orbius solution
- Orbius fitted managed Starlink mobility terminals across the fleet, delivering steady broadband in motion with central monitoring of every vehicle from one portal.
- Result
- On-board Wi-Fi fast enough for video calls and streaming for the whole journey, holding up consistently on routes where mobile networks previously faltered.
- Logistics & infrastructure
- Challenge
- A heavy logistics and materials-handling operator ran remote terminals, yards and transfer sites with little or no fixed connectivity — slowing operations, telemetry and safety systems at the very sites that needed them most.
- Orbius solution
- Orbius deployed managed LEO connectivity to those remote sites — rapidly installed, centrally monitored and integrated with the operator's existing systems and security policies.
- Result
- Sites brought online in days rather than months, at a lower running cost than legacy satellite, and onto the same managed network as the rest of the estate.
- Events
- Challenge
- A rural sales event spread across many acres needed reliable Wi-Fi for staff, payments and visitors — far from any fixed line, with no single mobile mast able to cover the whole site.
- Orbius solution
- Orbius deployed multiple Starlink terminals across the grounds as backhaul, feeding a single site-wide Wi-Fi network — installed, monitored and supported for the duration of the event.
- Result
- Full-site connectivity throughout the event, keeping payments and operations running across the whole estate without depending on congested mobile coverage.
- Local government
- Challenge
- A large council opened a new market venue, but the national fibre provider failed to deliver the promised line — leaving the site with no primary connectivity and an open-ended wait.
- Orbius solution
- Orbius installed managed Starlink as a long-term temporary primary connection — sized, secured and supported as the venue's main link until fibre is delivered.
- Result
- The venue opened and traded on schedule with full connectivity, removing its dependence on a stalled fibre installation.
- Logistics & distribution
- Challenge
- A distribution centre needed dependable primary connectivity — 4G couldn't deliver the low, consistent latency its barcode scanning and warehouse systems relied on.
- Orbius solution
- Orbius provided managed Starlink as the site's primary link, with low-latency performance and integration into the existing network and security policies.
- Result
- Reliable, low-latency scanning across the operation, replacing an unstable 4G link that had been slowing throughput.
Connectivity, designed and delivered for you
Tell us about your sites and we'll come back with a proposal — sizing, hardware and a managed service wrapped in a real SLA.